almost done. still to come: heated towel rack, medicine cabinet, motion sensitive exhaust fan switch, duplex outlets and finally a dumpster to complete.
gone are the floor to ceiling wainscoting, peel and stick floor tiles, and the vanity taking up 22 inches of a 36 inch wide path to the toilet. We are one week in to this project. We being Barb and I watching the guy doing the work, Will Summers.